ITAC Assessment: CO0485
ITAC logo
ITAC Assessment: CO0485
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product refined petroleum products
NAICS
n/a
SIC 2911: Petroleum Refining
Sales Range $100
M
to 500
M
# of Employees 25
Plant Area 1,135,000
ft2
Annual Production 4,015,000
bbl
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,797 5,289,758
kWh
Electricity Demand $77,021 13,224
kW-mo/yr
Electricity Fees $1,217 -
Natural Gas $1,436,418 516,209
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $505,570 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $398,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.2511: Insulate bare equipment $229,700 $118,560 - - $229,700
-
MMBtu
- - -
02 2.2441: Preheat boiler makeup water with waste process heat $59,590 $30,000 n/a - - $59,590
-
MMBtu
- - -
03 2.1333: Convert combustion equipment to burn oil $40,450 $30,000 - - $743,980
-
MMBtu
$(-703,530.0)
-
MMBtu
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $27,060 $28,000 - - $29,140
-
MMBtu
- $(-2,080.0) -
05 2.2511: Insulate bare equipment $23,640 $18,000 - - $23,640
-
MMBtu
- - -
06 2.3212: Optimize plant power factor $6,730 $23,000 - $6,730
-
kW-mo/yr
- - - -
07 2.4133: Use most efficient type of electric motors $2,600 $5,980 $1,870
85,700
kWh
$730
-
kW-mo/yr
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,680 $8,380 $1,680
76,900
kWh
- - - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $1,370 $2,340 $1,150
52,500
kWh
- - - $220 -
10 4.446: Automate finishing process $112,750 $100,000 $2,400
110,000
kWh
- - - $77,950 $32,400
TOTAL RECOMMENDED $505,570 $364,260 $7,100
325,100
kWh
$7,460
-
kW-mo/yr
$1,086,050
-
MMBtu
$(-703,530.0)
-
MMBtu
$76,090 $32,400
TOTAL IMPLEMENTED $398,800 $281,260 $7,100
325,100
kWh
$730
-
kW-mo/yr
$282,480
-
MMBtu
- $76,090 $32,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Fuel Oil #2 Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs