Assessment Year | 2001 |
---|---|
Principal Product | refined petroleum products |
NAICS |
n/a
|
SIC | 2911: Petroleum Refining |
Sales Range | $100 M to 500M |
# of Employees | 25 |
Plant Area |
1,135,000
ft2
|
Annual Production | 4,015,000
bbl
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Utah |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $108,797 | 5,289,758 |
kWh
|
$0.021 |
Electricity Demand | $77,021 | 13,224 |
kW-mo/yr
|
$5.82 |
Electricity Fees | $1,217 | - |
|
- |
Natural Gas | $1,436,418 | 516,209 |
MMBtu
|
$2.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $505,570 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $398,800 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2511: Insulate bare equipment | $229,700 | $118,560 | - | - |
$229,700
-
MMBtu
|
- | - | - | |
02 | 2.2441: Preheat boiler makeup water with waste process heat | $59,590 | $30,000 | n/a | - | - |
$59,590
-
MMBtu
|
- | - | - |
03 | 2.1333: Convert combustion equipment to burn oil | $40,450 | $30,000 | - | - |
$743,980
-
MMBtu
|
$(-703,530.0)
-
MMBtu
|
- | - | |
04 | 2.1233: Analyze flue gas for proper air/fuel ratio | $27,060 | $28,000 | - | - |
$29,140
-
MMBtu
|
- | $(-2,080.0) | - | |
05 | 2.2511: Insulate bare equipment | $23,640 | $18,000 | - | - |
$23,640
-
MMBtu
|
- | - | - | |
06 | 2.3212: Optimize plant power factor | $6,730 | $23,000 | - |
$6,730
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4133: Use most efficient type of electric motors | $2,600 | $5,980 |
$1,870
85,700
kWh
|
$730
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,680 | $8,380 |
$1,680
76,900
kWh
|
- | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,370 | $2,340 |
$1,150
52,500
kWh
|
- | - | - | $220 | - | |
10 | 4.446: Automate finishing process | $112,750 | $100,000 |
$2,400
110,000
kWh
|
- | - | - | $77,950 | $32,400 | |
TOTAL RECOMMENDED | $505,570 | $364,260 |
$7,100
325,100
kWh
|
$7,460
-
kW-mo/yr
|
$1,086,050
-
MMBtu
|
$(-703,530.0)
-
MMBtu
|
$76,090 | $32,400 | ||
TOTAL IMPLEMENTED | $398,800 | $281,260 |
$7,100
325,100
kWh
|
$730
-
kW-mo/yr
|
$282,480
-
MMBtu
|
- | $76,090 | $32,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Fuel Oil #2 Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs