ITAC Assessment: WV0109
ITAC logo
ITAC Assessment: WV0109
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Dairy PRoducts
NAICS
n/a
SIC 2026: Fluid Milk
Sales Range $50
M
to 100
M
# of Employees 125
Plant Area 92,000
ft2
Annual Production 220,000,000
lb
Production Hrs. Annual 8,736
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,660 840,211
kWh
Electricity Demand $182,195 17,528
kW-mo/yr
Electricity Fees $93,242 -
Natural Gas $119,512 31,423
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,583

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings By-product Production Savings
01 2.4133: Use most efficient type of electric motors $3,527 $5,295 $632
36,342
kWh
$2,895
-
kW-mo/yr
- - -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,337 $384 $2,337
136,870
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $616 $478 $616
35,463
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $962 $15 $962
55,393
kWh
- - - -
05 2.1233: Analyze flue gas for proper air/fuel ratio $26,265 $3,000 - - $26,265
-
MMBtu
- -
06 2.1213: Direct warmest air to combustion intake $7,904 $6,300 - - $7,904
-
MMBtu
- -
07 2.2136: Install / repair insulation on steam lines $1,550 $441 - - $1,550
-
MMBtu
- -
08 3.6192: Use a less expensive method of waste removal $35,000 $5,000 - - - - $35,000
09 3.5212: Regrind, reuse, or sell scrap plastic parts $5,200 $200 - - - - $5,200
10 4.211: Consider use / purchase of bulk materials where possible $46,800 - - - - $46,800 -
TOTAL RECOMMENDED $130,161 $21,113 $4,547
264,068
kWh
$2,895
-
kW-mo/yr
$35,719
-
MMBtu
$46,800 $40,200
TOTAL IMPLEMENTED $41,583 $15,420 $2,969
173,212
kWh
$2,895
-
kW-mo/yr
$35,719
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs