Assessment Year | 1997 |
---|---|
Principal Product | Dairy PRoducts |
NAICS |
n/a
|
SIC | 2026: Fluid Milk |
Sales Range | $50 M to 100M |
# of Employees | 125 |
Plant Area |
92,000
ft2
|
Annual Production | 220,000,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $52,660 | 840,211 |
kWh
|
$0.063 |
Electricity Demand | $182,195 | 17,528 |
kW-mo/yr
|
$10.39 |
Electricity Fees | $93,242 | - |
|
- |
Natural Gas | $119,512 | 31,423 |
MMBtu
|
$3.80 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $130,161 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,583 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $3,527 | $5,295 |
$632
36,342
kWh
|
$2,895
-
kW-mo/yr
|
- | - | - | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,337 | $384 |
$2,337
136,870
kWh
|
- | - | - | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $616 | $478 |
$616
35,463
kWh
|
- | - | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $962 | $15 |
$962
55,393
kWh
|
- | - | - | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $26,265 | $3,000 | - | - |
$26,265
-
MMBtu
|
- | - | |
06 | 2.1213: Direct warmest air to combustion intake | $7,904 | $6,300 | - | - |
$7,904
-
MMBtu
|
- | - | |
07 | 2.2136: Install / repair insulation on steam lines | $1,550 | $441 | - | - |
$1,550
-
MMBtu
|
- | - | |
08 | 3.6192: Use a less expensive method of waste removal | $35,000 | $5,000 | - | - | - | - | $35,000 | |
09 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $5,200 | $200 | - | - | - | - | $5,200 | |
10 | 4.211: Consider use / purchase of bulk materials where possible | $46,800 | - | - | - | - | $46,800 | - | |
TOTAL RECOMMENDED | $130,161 | $21,113 |
$4,547
264,068
kWh
|
$2,895
-
kW-mo/yr
|
$35,719
-
MMBtu
|
$46,800 | $40,200 | ||
TOTAL IMPLEMENTED | $41,583 | $15,420 |
$2,969
173,212
kWh
|
$2,895
-
kW-mo/yr
|
$35,719
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Raw Material Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs