ITAC Assessment: WV0105
ITAC logo
ITAC Assessment: WV0105
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom Compacted Resin
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 82,000
ft2
Annual Production 4,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,069 776,964
kWh
Electricity Demand $153,141 15,729
kW-mo/yr
Electricity Fees $92,545 -
Natural Gas $30,587 5,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,716 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,938

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,125 $1,564 $653
36,635
kWh
$472
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,079 $1,272 $199
11,137
kWh
$880
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $486 $293 $486
27,257
kWh
- - -
04 2.4221: Install compressor air intakes in coolest locations $878 $120 $878
49,238
kWh
- - -
05 2.2511: Insulate bare equipment $1,469 $214 $1,469
82,356
kWh
- - -
06 2.2612: Use cooling tower water instead of refrigeration $1,689 $7,100 $1,689
94,666
kWh
- - -
07 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $7,620 $5,400 $(-852.0)
(-47,773)
kWh
- $(-384.0) $8,856
08 3.4111: Use closed cycle process to minimize waste water production $2,370 $500 - - - $2,370
TOTAL RECOMMENDED $16,716 $16,463 $4,522
253,516
kWh
$1,352
-
kW-mo/yr
$(-384.0) $11,226
TOTAL IMPLEMENTED $5,938 $3,749 $2,216
124,267
kWh
$1,352
-
kW-mo/yr
- $2,370
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs