ITAC Assessment: MA0278
ITAC logo
ITAC Assessment: MA0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Single use carbon paper
NAICS
n/a
SIC 3955: Carbon Paper and Inked Ribbons
Sales Range $5
M
to 10
M
# of Employees 38
Plant Area 31,800
ft2
Annual Production 20,000
pieces
Production Hrs. Annual 3,510
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $89,209 815,064
kWh
Natural Gas $22,793 5,299
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,454 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,604 $225 $1,604
14,654
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $802 $1,108 $802
7,327
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $989 $1,459 - $989
-
MMBtu
04 2.2511: Insulate bare equipment $417 $270 $417
3,810
kWh
-
05 2.6218: Turn off equipment when not in use $321 - $321
2,931
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $321 $191 $321
2,931
kWh
-
TOTAL RECOMMENDED $4,454 $3,253 $3,465
31,653
kWh
$989
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs