ITAC Assessment: WV0100
ITAC logo
ITAC Assessment: WV0100
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Coatings for Packages and Cans
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 84,000
ft2
Annual Production 1,000
Tgal
Production Hrs. Annual 3,500
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,308 987,104
kWh
Electricity Demand $21,353 4,150
kW-mo/yr
Electricity Fees $3,676 -
Natural Gas $42,216 10,373
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,595 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,124

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,071 $261 $835
19,637
kWh
$1,236
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $256 $573 $77
1,758
kWh
$179
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $207 $30 $207
4,982
kWh
- - -
04 2.7241: Install outside air damper / economizer on hvac unit $753 $4,725 $753
17,878
kWh
- - -
05 2.6212: Turn off equipment during breaks, reduce operating time $2,817 - $2,817
66,530
kWh
- - -
06 2.2511: Insulate bare equipment $1,680 $2,290 - - $1,680
-
MMBtu
-
07 2.2511: Insulate bare equipment $545 $656 - - $545
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,070 $1,900 - - $1,070
-
MMBtu
-
09 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $7,236 $3,000 - - $7,236
-
MMBtu
-
10 3.5217: Reuse / recycle/ sell paper products $3,840 $150 - - - $3,840
11 3.5316: Contract a wood pallet recycling company $3,120 $100 - - - $3,120
TOTAL RECOMMENDED $23,595 $13,685 $4,689
110,785
kWh
$1,415
-
kW-mo/yr
$10,531
-
MMBtu
$6,960
TOTAL IMPLEMENTED $9,124 $5,204 $1,119
26,377
kWh
$1,415
-
kW-mo/yr
$2,750
-
MMBtu
$3,840
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs