ITAC Assessment: WV0097
ITAC logo
ITAC Assessment: WV0097
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Vinyl Drapes and Blinds
NAICS
n/a
SIC 2391: Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 285
Plant Area 90,000
ft2
Annual Production 600,600
pieces
Production Hrs. Annual 5,148
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,705 851,700
kWh
Electricity Demand $26,192 2,320
kW-mo/yr
Electricity Fees $15,077 -
LPG $20,332 2,972
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,386 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,058

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,328 $3,412 $795
26,964
kWh
$1,533
-
kW-mo/yr
- - -
02 2.7241: Install outside air damper / economizer on hvac unit $1,096 $2,734 $1,096
37,222
kWh
- - - -
03 2.7261: Install timers and/or thermostats $4,424 $3,000 - - $4,424
-
MMBtu
- -
04 3.5217: Reuse / recycle/ sell paper products $1,531 $150 - - - - $1,531
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $1,927 $5,000 - - - $(-1,286.0) $3,213
06 3.5316: Contract a wood pallet recycling company $2,080 $200 - - - - $2,080
TOTAL RECOMMENDED $13,386 $14,496 $1,891
64,186
kWh
$1,533
-
kW-mo/yr
$4,424
-
MMBtu
$(-1,286.0) $6,824
TOTAL IMPLEMENTED $11,058 $11,084 $1,096
37,222
kWh
- $4,424
-
MMBtu
$(-1,286.0) $6,824
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs