ITAC Assessment: BD0032
ITAC logo
ITAC Assessment: BD0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Semi Trailers
NAICS
n/a
SIC 3715: Truck Trailers
Sales Range $50
M
to 100
M
# of Employees 480
Plant Area 133,469
ft2
Annual Production 7,280
pieces
Production Hrs. Annual 5,460
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $187,016 2,753,810
kWh
Natural Gas $52,101 13,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $52,294 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $1,546 $600 $1,546
22,860
kWh
- -
02 2.2437: Recover waste heat from equipment $3,653 $3,000 - $3,653
-
MMBtu
-
03 3.2121: Convert to electrostatic powder coating $40,960 $1,900 - - $40,960
04 2.4133: Use most efficient type of electric motors $5,743 $11,340 $5,743
84,701
kWh
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $392 $20 $392
5,862
kWh
- -
TOTAL RECOMMENDED $52,294 $16,860 $7,681
113,423
kWh
$3,653
-
MMBtu
$40,960
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs