ITAC Assessment: CO0690
ITAC logo
ITAC Assessment: CO0690
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Toner Cartridges
NAICS 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 3861: Photographic Equipment and Supplies
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 90,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,223
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $25,311 599,853
kWh
Electricity Demand $61,629 2,963
kW-mo/yr
Electricity Fees $2,416 -
Natural Gas $26,418 3,584
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,720 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,850

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $1,730 $1,460 $480
10,900
kWh
$1,250
-
kW-mo/yr
- - -
02 2.6218: Turn off equipment when not in use $1,180 - $1,180
27,100
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $940 $370 $260
6,000
kWh
$680
-
kW-mo/yr
- - -
04 2.7243: Improve air circulation with destratification fans / other methods $5,790 $28,490 $(-240.0)
(-5,500)
kWh
$(-170.0)
-
kW-mo/yr
$6,200
-
MMBtu
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,080 $5,800 $1,370
31,600
kWh
$570
-
kW-mo/yr
- $50 $90
TOTAL RECOMMENDED $11,720 $36,120 $3,050
70,100
kWh
$2,330
-
kW-mo/yr
$6,200
-
MMBtu
$50 $90
TOTAL IMPLEMENTED $3,850 $1,830 $1,920
44,000
kWh
$1,930
-
kW-mo/yr
- - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs