| Assessment Year | 2014 |
|---|---|
| Principal Product | Toner Cartridges |
| NAICS | 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing |
| SIC | 3861: Photographic Equipment and Supplies |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
90,000
ft2
|
| Annual Production | 300,000
pieces
|
| Production Hrs. Annual | 2,223
hrs
|
| Location (State) | Colorado |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $25,311 | 599,853 |
kWh
|
$0.042 |
| Electricity Demand | $61,629 | 2,963 |
kW-mo/yr
|
$20.80 |
| Electricity Fees | $2,416 | - |
|
- |
| Natural Gas | $26,418 | 3,584 |
MMBtu
|
$7.37 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $11,720 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $3,850 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $1,730 | $1,460 |
$480
10,900
kWh
|
$1,250
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.6218: Turn off equipment when not in use | $1,180 | - |
$1,180
27,100
kWh
|
- | - | - | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $940 | $370 |
$260
6,000
kWh
|
$680
-
kW-mo/yr
|
- | - | - | |
| 04 | 2.7243: Improve air circulation with destratification fans / other methods | $5,790 | $28,490 |
$(-240.0)
(-5,500)
kWh
|
$(-170.0)
-
kW-mo/yr
|
$6,200
-
MMBtu
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,080 | $5,800 |
$1,370
31,600
kWh
|
$570
-
kW-mo/yr
|
- | $50 | $90 | |
| TOTAL RECOMMENDED | $11,720 | $36,120 |
$3,050
70,100
kWh
|
$2,330
-
kW-mo/yr
|
$6,200
-
MMBtu
|
$50 | $90 | ||
| TOTAL IMPLEMENTED | $3,850 | $1,830 |
$1,920
44,000
kWh
|
$1,930
-
kW-mo/yr
|
- | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs