ITAC Assessment: WV0093
ITAC logo
ITAC Assessment: WV0093
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Paper products and placemats
NAICS
n/a
SIC 2759: Commercial Printing, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 86
Plant Area 147,600
ft2
Annual Production 8,500,000
pieces
Production Hrs. Annual 3,945
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,744 2,238,277
kWh
Electricity Demand $76,624 8,362
kW-mo/yr
Electricity Fees $1,055 -
Natural Gas $36,583 4,856
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,604 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,610

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $581 $567 $116
3,810
kWh
$465
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $426 $906 $72
2,638
kWh
$354
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $309 $160 $309
10,844
kWh
- - - -
04 2.7111: Reduce illumination to minimum necessary levels $967 $330 $499
16,999
kWh
$468
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $275 $365 $275
9,379
kWh
- - - -
06 2.4314: Use synthetic lubricant $327 $630 $327
11,137
kWh
- - - -
07 2.2511: Insulate bare equipment $65 $26 $65
2,052
kWh
- - - -
08 2.2437: Recover waste heat from equipment $1,190 $361 - - $1,190
-
MMBtu
- -
09 3.6193: Install equipment (eg compactor) to reduce disposal costs $2,464 $7,000 - - - $(-1,286.0) $3,750
TOTAL RECOMMENDED $6,604 $10,345 $1,663
56,859
kWh
$1,287
-
kW-mo/yr
$1,190
-
MMBtu
$(-1,286.0) $3,750
TOTAL IMPLEMENTED $2,610 $2,593 $1,323
45,428
kWh
$1,287
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs