ITAC Assessment: WV0087
ITAC logo
ITAC Assessment: WV0087
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Metal, Glass & Ceramic Seals
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 70,545
ft2
Annual Production 6,000,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,825 4,233,880
kWh
Electricity Demand $44,353 8,417
kW-mo/yr
Electricity Fees $11,377 -
Natural Gas $9,683 1,470
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,642

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,024 $1,580 $1,698
36,342
kWh
$326
-
kW-mo/yr
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $327 $160 $327
7,034
kWh
- - -
03 2.4221: Install compressor air intakes in coolest locations $195 $320 $195
4,103
kWh
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $825 $300 $825
17,585
kWh
- - -
05 2.7241: Install outside air damper / economizer on hvac unit $1,071 $1,467 $1,071
22,860
kWh
- - -
06 2.8114: Change rate schedules or other changes in utility service $6,158 $12,000 - - - $6,158
07 2.2511: Insulate bare equipment $7,466 $1,085 $6,298
135,404
kWh
$1,168
-
kW-mo/yr
- -
08 3.4111: Use closed cycle process to minimize waste water production $82,766 $960 - - $82,766
-
Tgal
-
TOTAL RECOMMENDED $100,832 $17,872 $10,414
223,328
kWh
$1,494
-
kW-mo/yr
$82,766
-
Tgal
$6,158
TOTAL IMPLEMENTED $10,642 $3,125 $9,148
196,365
kWh
$1,494
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Administrative Changes Savings