ITAC Assessment: TT0131
ITAC logo
ITAC Assessment: TT0131
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Small electric motors
NAICS 335312: Motor and Generator Manufacturing
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 200,000
ft2
Annual Production 2,200,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,464,928 21,888,160
kWh
Electricity Demand $163,160 39,127
kW-mo/yr
Natural Gas $85,115 8,166
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $265,161 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $29,917

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4221: Install compressor air intakes in coolest locations $2,347 $972 $2,347
35,030
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $22,605 $30,150 $22,605
337,392
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $26,715 $63,236 $26,715
398,736
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,202 $16,590 $3,202
47,795
kWh
05 2.3512: De-energize excess transformer capacity $3,687 $8,925 $3,687
55,036
kWh
06 2.2614: Use cooling tower or economizer to replace chiller cooling $206,605 $247,740 $206,605
3,103,533
kWh
TOTAL RECOMMENDED $265,161 $367,613 $265,161
3,977,522
kWh
TOTAL IMPLEMENTED $29,917 $79,826 $29,917
446,531
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs