ITAC Assessment: WV0078
ITAC logo
ITAC Assessment: WV0078
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Nuts
NAICS
n/a
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $10
M
to 50
M
# of Employees 83
Plant Area 200,000
ft2
Annual Production 345,000,000
pieces
Production Hrs. Annual 3,920
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,915 5,371,923
kWh
Electricity Demand $173,601 11,109
kW-mo/yr
Electricity Fees $1,223 -
Natural Gas $90,052 18,726
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,746 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,888

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,384 $5,486 $1,384
36,049
kWh
- -
02 2.4133: Use most efficient type of electric motors $1,296 $16,080 $1,296
33,705
kWh
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,694 $3,000 - $1,694
-
MMBtu
-
04 2.4221: Install compressor air intakes in coolest locations $7,326 $360 $7,326
191,383
kWh
- -
05 2.2437: Recover waste heat from equipment $1,702 $630 - $1,702
-
MMBtu
-
06 2.7243: Improve air circulation with destratification fans / other methods $1,506 $1,200 $(-33.0)
(-879)
kWh
$1,539
-
MMBtu
-
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $5,838 $7,000 - - $5,838
-
lb
TOTAL RECOMMENDED $20,746 $33,756 $9,973
260,258
kWh
$4,935
-
MMBtu
$5,838
-
lb
TOTAL IMPLEMENTED $5,888 $23,396 $2,647
68,875
kWh
$3,241
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs