Assessment Year | 1996 |
---|---|
Principal Product | Nuts |
NAICS |
n/a
|
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $10 M to 50M |
# of Employees | 83 |
Plant Area |
200,000
ft2
|
Annual Production | 345,000,000
pieces
|
Production Hrs. Annual | 3,920
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,915 | 5,371,923 |
kWh
|
$0.026 |
Electricity Demand | $173,601 | 11,109 |
kW-mo/yr
|
$15.63 |
Electricity Fees | $1,223 | - |
|
- |
Natural Gas | $90,052 | 18,726 |
MMBtu
|
$4.81 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $20,746 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,888 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,384 | $5,486 |
$1,384
36,049
kWh
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $1,296 | $16,080 |
$1,296
33,705
kWh
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,694 | $3,000 | - |
$1,694
-
MMBtu
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $7,326 | $360 |
$7,326
191,383
kWh
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $1,702 | $630 | - |
$1,702
-
MMBtu
|
- | |
06 | 2.7243: Improve air circulation with destratification fans / other methods | $1,506 | $1,200 |
$(-33.0)
(-879)
kWh
|
$1,539
-
MMBtu
|
- | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $5,838 | $7,000 | - | - |
$5,838
-
lb
|
|
TOTAL RECOMMENDED | $20,746 | $33,756 |
$9,973
260,258
kWh
|
$4,935
-
MMBtu
|
$5,838
-
lb
|
||
TOTAL IMPLEMENTED | $5,888 | $23,396 |
$2,647
68,875
kWh
|
$3,241
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs