ITAC Assessment: UF0018
ITAC logo
ITAC Assessment: UF0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product MEDICAL PRODUCTS
NAICS
n/a
SIC 3841: Surgical and Medical Instruments and Apparatus
Sales Range $10
M
to 50
M
# of Employees 294
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $804,425 13,332,943
kWh
Natural Gas $64,594 14,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,808 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,596

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $19,125 $12,242 $19,125
318,875
kWh
02 2.7144: Install spectral reflectors / delamp $35,508 $41,505 $35,508
591,735
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,688 $22,891 $1,688
28,136
kWh
04 2.3511: Use plant owned transformers or lease transformers $34,361 $55,315 $34,361
-
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,341 $275 $1,341
22,274
kWh
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $8,896 - $8,896
-
kWh
07 2.4133: Use most efficient type of electric motors $1,038 $7,322 $1,038
17,292
kWh
08 2.6232: Install set-back timers $851 $480 $851
14,068
kWh
TOTAL RECOMMENDED $102,808 $140,030 $102,808
992,380
kWh
TOTAL IMPLEMENTED $67,596 $84,235 $67,596
978,312
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs