ITAC Assessment: BS0062
ITAC logo
ITAC Assessment: BS0062
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Dimensional Lumber
NAICS 321113: Sawmills
SIC 2421: Sawmills and Planing Mills, General
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 2,009,000
ft2
Annual Production 125,000
thousand feet
Production Hrs. Annual 3,150
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,482,626 20,140,820
kWh
Electricity Demand $372,739 59,512
kW-mo/yr
LPG $16,000 1,039
MMBtu
Wood $14,000 4,636
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,168 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,332

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Wood Savings
01 2.6218: Turn off equipment when not in use $6,803 $1,125 $4,849
65,520
kWh
$1,954
-
kW-mo/yr
- -
02 2.2122: Install / repair insulation on condensate lines $450 $661 - - - $450
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $703 $447 $630
8,509
kWh
$73
-
kW-mo/yr
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,584 $3,035 $2,518
34,020
kWh
$846
-
kW-mo/yr
$(-1,779.4)
-
MMBtu
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $629 $15 $466
6,300
kWh
$163
-
kW-mo/yr
- -
TOTAL RECOMMENDED $10,168 $5,283 $8,462
114,349
kWh
$3,035
-
kW-mo/yr
$(-1,779.4)
-
MMBtu
$450
-
MMBtu
TOTAL IMPLEMENTED $1,332 $462 $1,096
14,809
kWh
$236
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs