Assessment Year | 2017 |
---|---|
Principal Product | Paper Food Packaging |
NAICS | 322211: Corrugated and Solid Fiber Box Manufacturing |
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 152 |
Plant Area |
130,000
ft2
|
Annual Production | 23,985,229
lb
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $309,201 | 4,045,111 |
kWh
|
$0.076 | |
Electricity Demand | $42,964 | 10,356 |
kW-mo/yr
|
$4.15 | |
Natural Gas | $31,218 | 6,703 |
MMBtu
|
$4.66 | |
Waste Disposal Costs | |||||
Water Usage | $8,751 | 707 |
Tgal
|
$12.38 | |
Water Disposal | $7,553 | 707 |
Tgal
|
$10.68 | |
TOTAL YEARLY COSTS | $399,687 | ||||
RECOMMENDED SAVINGS* | $76,501 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $6,083 | - |
$10,054
131,609
kWh
|
$2,590
-
kW-mo/yr
|
$(-6,561.0)
-
MMBtu
|
- | - | |
02 | 2.2211: Use optimum temperature | $652 | $500 | - | - |
$652
-
MMBtu
|
- | - | |
03 | 3.4116: Meter recycled water (to reduce sewer charges) | $5,847 | $500 | - | - | - |
$5,847
-
Tgal
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,000 | $1,000 |
$9,586
125,493
kWh
|
$1,134
-
kW-mo/yr
|
- | - | $(-720.0) | |
05 | 2.4239: Eliminate or reduce compressed air usage | $4,749 | $2,840 |
$4,246
55,589
kWh
|
$503
-
kW-mo/yr
|
- | - | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,522 | - |
$3,149
41,223
kWh
|
$373
-
kW-mo/yr
|
- | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $31,348 | $36,424 |
$28,027
367,321
kWh
|
$3,321
-
kW-mo/yr
|
- | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $8,225 | $21,449 |
$7,355
96,288
kWh
|
$870
-
kW-mo/yr
|
- | - | - | |
09 | 2.7144: Install spectral reflectors / delamp | $6,075 | - |
$5,048
66,079
kWh
|
$597
-
kW-mo/yr
|
- | - | $430 | |
TOTAL RECOMMENDED | $76,501 | $62,713 |
$67,465
883,602
kWh
|
$9,388
-
kW-mo/yr
|
$(-5,909.0)
-
MMBtu
|
$5,847
-
Tgal
|
$(-290.0) | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs