Assessment Year | 1995 |
---|---|
Principal Product | Blow Molded Plastics |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 175 |
Plant Area |
110,000
ft2
|
Annual Production | 5,000
ton
|
Production Hrs. Annual | 7,344
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $434,624 | 10,121,044 |
kWh
|
$0.043 |
Natural Gas | $14,583 | 2,532 |
MMBtu
|
$5.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $55,108 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $49,682 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,852 | $600 |
$1,852
132,767
kWh
|
- | - | - | |
02 | 2.7243: Improve air circulation with destratification fans / other methods | $1,374 | $3,200 |
$(-31.0)
(-2,052)
kWh
|
$1,405
-
MMBtu
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $98 | $187 | - |
$98
-
MMBtu
|
- | - | |
04 | 2.2511: Insulate bare equipment | $4,513 | $1,470 |
$4,513
135,698
kWh
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $913 | $720 |
$913
65,358
kWh
|
- | - | - | |
06 | 3.5311: Recover and reuse waste material | $46,358 | $10,000 | - | - |
$17,416
-
lb
|
$28,942 | |
TOTAL RECOMMENDED | $55,108 | $16,177 |
$7,247
331,771
kWh
|
$1,503
-
MMBtu
|
$17,416
-
lb
|
$28,942 | ||
TOTAL IMPLEMENTED | $49,682 | $13,987 |
$1,821
130,715
kWh
|
$1,503
-
MMBtu
|
$17,416
-
lb
|
$28,942 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs