ITAC Assessment: WV0071
ITAC logo
ITAC Assessment: WV0071
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Blow Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 110,000
ft2
Annual Production 5,000
ton
Production Hrs. Annual 7,344
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $434,624 10,121,044
kWh
Natural Gas $14,583 2,532
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,108 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,682

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,852 $600 $1,852
132,767
kWh
- - -
02 2.7243: Improve air circulation with destratification fans / other methods $1,374 $3,200 $(-31.0)
(-2,052)
kWh
$1,405
-
MMBtu
- -
03 2.7447: Install vinyl strip / high speed / air curtain doors $98 $187 - $98
-
MMBtu
- -
04 2.2511: Insulate bare equipment $4,513 $1,470 $4,513
135,698
kWh
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $913 $720 $913
65,358
kWh
- - -
06 3.5311: Recover and reuse waste material $46,358 $10,000 - - $17,416
-
lb
$28,942
TOTAL RECOMMENDED $55,108 $16,177 $7,247
331,771
kWh
$1,503
-
MMBtu
$17,416
-
lb
$28,942
TOTAL IMPLEMENTED $49,682 $13,987 $1,821
130,715
kWh
$1,503
-
MMBtu
$17,416
-
lb
$28,942
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs