Assessment Year | 2016 |
---|---|
Principal Product | Fabricated steel storage tanks |
NAICS | 332420: Metal Tank (Heavy Gauge) Manufacturing |
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 70 |
Plant Area |
50,335
ft2
|
Annual Production | 1,300,000
units
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Colorado |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $20,348 | 511,040 |
kWh
|
$0.040 |
Electricity Demand | $61,857 | 2,940 |
kW-mo/yr
|
$21.04 |
Electricity Fees | $1,755 | - |
|
- |
Natural Gas | $42,784 | 4,890 |
MMBtu
|
$8.75 |
TOTAL YEARLY COSTS | $126,744 | |||
RECOMMENDED SAVINGS* | $33,510 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,390 | - | - |
$2,390
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $880 | $110 |
$420
11,500
kWh
|
$460
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,500 | $21,280 |
$4,240
115,400
kWh
|
$10,100
-
kW-mo/yr
|
- | $(-920.0) | - | $1,080 | |
04 | 2.7221: Lower temperature during the winter season and vice-versa | $5,910 | $560 | - | - |
$5,910
-
MMBtu
|
- | - | - | |
05 | 2.7492: Use proper thickness of insulation on building envelope | $4,830 | $6,980 | - | - |
$4,830
-
MMBtu
|
- | - | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $2,180 | - |
$(-3,690.0)
-
kWh
|
$5,520
-
kW-mo/yr
|
- | - | $350 | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $920 | $5,520 |
$330
8,400
kWh
|
$780
-
kW-mo/yr
|
- | $10 | - | $(-200.0) | |
08 | 2.8121: Apply for tax-free status for energy purchases | $1,900 | $500 | - | - | - | - | $1,900 | - | |
TOTAL RECOMMENDED | $33,510 | $34,950 |
$1,300
135,300
kWh
|
$19,250
-
kW-mo/yr
|
$10,740
-
MMBtu
|
$(-910.0) | $2,250 | $880 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs