ITAC Assessment: CO0722
ITAC logo
ITAC Assessment: CO0722
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Fabricated steel storage tanks
NAICS 332420: Metal Tank (Heavy Gauge) Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 50,335
ft2
Annual Production 1,300,000
units
Production Hrs. Annual 2,210
hrs
Location (State) Colorado

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $20,348 511,040
kWh
Electricity Demand $61,857 2,940
kW-mo/yr
Electricity Fees $1,755 -
Natural Gas $42,784 4,890
MMBtu
TOTAL YEARLY COSTS $126,744
RECOMMENDED SAVINGS* $33,510 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,390 - - $2,390
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $880 $110 $420
11,500
kWh
$460
-
kW-mo/yr
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $14,500 $21,280 $4,240
115,400
kWh
$10,100
-
kW-mo/yr
- $(-920.0) - $1,080
04 2.7221: Lower temperature during the winter season and vice-versa $5,910 $560 - - $5,910
-
MMBtu
- - -
05 2.7492: Use proper thickness of insulation on building envelope $4,830 $6,980 - - $4,830
-
MMBtu
- - -
06 2.8114: Change rate schedules or other changes in utility service $2,180 - $(-3,690.0)
-
kWh
$5,520
-
kW-mo/yr
- - $350 -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $920 $5,520 $330
8,400
kWh
$780
-
kW-mo/yr
- $10 - $(-200.0)
08 2.8121: Apply for tax-free status for energy purchases $1,900 $500 - - - - $1,900 -
TOTAL RECOMMENDED $33,510 $34,950 $1,300
135,300
kWh
$19,250
-
kW-mo/yr
$10,740
-
MMBtu
$(-910.0) $2,250 $880
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs