ITAC Assessment: WV0067
ITAC logo
ITAC Assessment: WV0067
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel Castings
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 270,600
ft2
Annual Production 5,928,000
lb
Production Hrs. Annual 4,420
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,927 1,345,545
kWh
Natural Gas $104,879 26,983
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,236 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,263 $2,153 $1,263
30,188
kWh
-
02 2.4133: Use most efficient type of electric motors $4,147 $13,870 $4,147
95,545
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,573 - $1,573
36,342
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $561 $260 $561
12,896
kWh
-
05 2.2136: Install / repair insulation on steam lines $224 $140 - $224
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $172 $500 - $172
-
MMBtu
07 2.7243: Improve air circulation with destratification fans / other methods $2,296 $3,500 - $2,296
-
MMBtu
TOTAL RECOMMENDED $10,236 $20,423 $7,544
174,971
kWh
$2,692
-
MMBtu
TOTAL IMPLEMENTED $7,207 $16,163 $6,983
162,075
kWh
$224
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs