ITAC Assessment: SD0382
ITAC logo
ITAC Assessment: SD0382
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product roof tile
NAICS 324122: Asphalt Shingle and Coating Materials Manufacturing
SIC 3269: Pottery Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 95
Plant Area 100,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 8,652
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,132 9,416,180
kWh
Electricity Demand $140,140 16,744
kW-mo/yr
Natural Gas $2,096,318 2,824,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $214,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.1221: Replace obsolete burners with more efficient ones $134,839 $448,000 - - $134,839
-
MMBtu
-
02 2.2414: Use waste heat from hot flue gases to preheat $52,310 $8,020 - - $52,310
-
MMBtu
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,389 $12,675 $6,389
88,748
kWh
- - -
04 2.7134: Use photocell controls $1,784 $2,937 $1,349
18,736
kWh
$435
-
kW-mo/yr
- -
05 3.6193: Install equipment (eg compactor) to reduce disposal costs $19,460 $19,500 - - - $19,460
TOTAL RECOMMENDED $214,782 $491,132 $7,738
107,484
kWh
$435
-
kW-mo/yr
$187,149
-
MMBtu
$19,460
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs