ITAC Assessment: WV0065
ITAC logo
ITAC Assessment: WV0065
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Custom Designed Industrial Rubber Products
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 114
Plant Area 124,049
ft2
Annual Production 1,200,000
lb
Production Hrs. Annual 6,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $168,421 3,163,540
kWh
Natural Gas $332,261 65,333
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,944 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,618

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,959 $832 $1,959
57,151
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,615 $800 $1,615
47,186
kWh
-
03 2.4314: Use synthetic lubricant $1,316 $300 $1,316
38,394
kWh
-
04 2.7261: Install timers and/or thermostats $870 $510 - $870
-
MMBtu
05 2.2511: Insulate bare equipment $880 $513 - $880
-
MMBtu
06 2.2136: Install / repair insulation on steam lines $9,848 $8,003 - $9,848
-
MMBtu
07 2.1233: Analyze flue gas for proper air/fuel ratio $5,650 $5,000 - $5,650
-
MMBtu
08 2.1222: Install turbulators $1,291 $1,040 - $1,291
-
MMBtu
09 2.3212: Optimize plant power factor $2,515 $5,545 $2,515
-
kWh
-
TOTAL RECOMMENDED $25,944 $22,543 $7,405
142,731
kWh
$18,539
-
MMBtu
TOTAL IMPLEMENTED $15,618 $10,448 $4,890
142,731
kWh
$10,728
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs