Assessment Year | 1995 |
---|---|
Principal Product | Perishable Cutting tools |
NAICS |
n/a
|
SIC | 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices |
Sales Range | $10 M to 50M |
# of Employees | 145 |
Plant Area |
45,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 5,610
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $95,289 | 1,260,844 |
kWh
|
$0.076 |
Natural Gas | $14,050 | 2,376 |
MMBtu
|
$5.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,395 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,142 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,417 | $1,162 |
$2,417
55,686
kWh
|
- | |
02 | 2.7124: Make a practice of turning off lights when not needed | $5,239 | $3,730 |
$5,239
121,043
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,045 | - |
$1,045
24,033
kWh
|
- | |
04 | 2.4133: Use most efficient type of electric motors | $3,441 | $7,970 |
$3,441
63,599
kWh
|
- | |
05 | 2.2511: Insulate bare equipment | $3,388 | $1,804 |
$3,388
78,253
kWh
|
- | |
06 | 2.7241: Install outside air damper / economizer on hvac unit | $6,013 | $6,000 |
$6,013
138,921
kWh
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $229 | $90 |
$229
6,448
kWh
|
- | |
08 | 2.2437: Recover waste heat from equipment | $384 | $670 | - |
$384
-
MMBtu
|
|
09 | 2.4314: Use synthetic lubricant | $239 | - |
$239
5,569
kWh
|
- | |
TOTAL RECOMMENDED | $22,395 | $21,426 |
$22,011
493,552
kWh
|
$384
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,142 | $12,862 |
$12,142
264,361
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs