ITAC Assessment: WV0061
ITAC logo
ITAC Assessment: WV0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Perishable Cutting tools
NAICS
n/a
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 45,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 5,610
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,289 1,260,844
kWh
Natural Gas $14,050 2,376
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,395 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,142

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,417 $1,162 $2,417
55,686
kWh
-
02 2.7124: Make a practice of turning off lights when not needed $5,239 $3,730 $5,239
121,043
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,045 - $1,045
24,033
kWh
-
04 2.4133: Use most efficient type of electric motors $3,441 $7,970 $3,441
63,599
kWh
-
05 2.2511: Insulate bare equipment $3,388 $1,804 $3,388
78,253
kWh
-
06 2.7241: Install outside air damper / economizer on hvac unit $6,013 $6,000 $6,013
138,921
kWh
-
07 2.4221: Install compressor air intakes in coolest locations $229 $90 $229
6,448
kWh
-
08 2.2437: Recover waste heat from equipment $384 $670 - $384
-
MMBtu
09 2.4314: Use synthetic lubricant $239 - $239
5,569
kWh
-
TOTAL RECOMMENDED $22,395 $21,426 $22,011
493,552
kWh
$384
-
MMBtu
TOTAL IMPLEMENTED $12,142 $12,862 $12,142
264,361
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs