ITAC Assessment: UD0437
ITAC logo
ITAC Assessment: UD0437
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product machined components and fabrications
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 99,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,745 1,941,383
kWh
Natural Gas $25,962 5,142
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,333 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $359

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,799 - $4,799
-
kWh
-
02 2.2437: Recover waste heat from equipment $1,097 $1,500 - $1,097
-
MMBtu
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,349 $500 $2,349
84,408
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,742 $7,965 $3,742
51,583
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $359 $375 $359
4,396
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,987 $2,500 $1,987
20,809
kWh
-
TOTAL RECOMMENDED $14,333 $12,840 $13,236
161,196
kWh
$1,097
-
MMBtu
TOTAL IMPLEMENTED $359 $375 $359
4,396
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs