| Assessment Year | 1994 |
|---|---|
| Principal Product | machined components and fabrications |
| NAICS |
n/a
|
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $10 M to 50M |
| # of Employees | 100 |
| Plant Area |
99,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,000
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $107,745 | 1,941,383 |
kWh
|
$0.055 |
| Natural Gas | $25,962 | 5,142 |
MMBtu
|
$5.05 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $14,333 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $359 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,799 | - |
$4,799
-
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $1,097 | $1,500 | - |
$1,097
-
MMBtu
|
|
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,349 | $500 |
$2,349
84,408
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,742 | $7,965 |
$3,742
51,583
kWh
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $359 | $375 |
$359
4,396
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,987 | $2,500 |
$1,987
20,809
kWh
|
- | |
| TOTAL RECOMMENDED | $14,333 | $12,840 |
$13,236
161,196
kWh
|
$1,097
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $359 | $375 |
$359
4,396
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs