ITAC Assessment: WV0057
ITAC logo
ITAC Assessment: WV0057
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Steel fabrication, forging, and rolling
NAICS
n/a
SIC 3312: Steel Works, Blast Furnaces (Including Coke Ovens), and Rolling Mills
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 390,000
ft2
Annual Production 34,700,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $342,722 7,213,951
kWh
Natural Gas $798,477 253,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,252 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,696

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7124: Make a practice of turning off lights when not needed $694 - $694
18,464
kWh
-
02 2.4226: Use / purchase optimum sized compressor $38,326 $36,000 $38,326
1,020,223
kWh
-
03 2.7291: Reschedule and rearrange multiple-source heating systems $4,127 $19 - $4,127
-
MMBtu
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,409 - $1,409
37,515
kWh
-
05 2.4314: Use synthetic lubricant $2,696 - $2,696
71,805
kWh
-
TOTAL RECOMMENDED $47,252 $36,019 $43,125
1,148,007
kWh
$4,127
-
MMBtu
TOTAL IMPLEMENTED $2,696 - $2,696
71,805
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs