ITAC Assessment: WV0055
ITAC logo
ITAC Assessment: WV0055
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Laboratory Incubators and Low Temperature Freezers
NAICS
n/a
SIC 3811:
Sales Range $10
M
to 50
M
# of Employees 421
Plant Area 145,440
ft2
Annual Production 400,000
pieces
Production Hrs. Annual 4,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $208,879 4,371,337
kWh
Natural Gas $119,675 16,672
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,822 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,606

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,944 $1,558 $1,944
58,030
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $655 $500 $655
19,343
kWh
-
03 2.2437: Recover waste heat from equipment $768 $374 - $768
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $589 $760 $589
17,585
kWh
-
05 2.7243: Improve air circulation with destratification fans / other methods $11,042 $18,000 - $11,042
-
MMBtu
06 2.2511: Insulate bare equipment $21,174 $3,902 - $21,174
-
MMBtu
07 2.1213: Direct warmest air to combustion intake $2,650 $3,780 - $2,650
-
MMBtu
TOTAL RECOMMENDED $38,822 $28,874 $3,188
94,958
kWh
$35,634
-
MMBtu
TOTAL IMPLEMENTED $6,606 $6,972 $3,188
94,958
kWh
$3,418
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs