ITAC Assessment: WV0050
ITAC logo
ITAC Assessment: WV0050
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Ball and roller Bearings
NAICS
n/a
SIC 3562: Ball and Roller Bearings
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area 92,000
ft2
Annual Production 3,600
pieces
Production Hrs. Annual 4,004
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $60,506 491,208
kWh
Natural Gas $29,579 2,737
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,969 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,540

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $415 $730 - $415
-
MMBtu
02 2.2136: Install / repair insulation on steam lines $868 $240 - $868
-
MMBtu
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $69 - $69
1,758
kWh
-
04 2.4133: Use most efficient type of electric motors $1,519 $6,340 $1,519
38,394
kWh
-
05 2.4314: Use synthetic lubricant $84 - $84
2,052
kWh
-
06 2.7447: Install vinyl strip / high speed / air curtain doors $3,014 $3,226 - $3,014
-
MMBtu
TOTAL RECOMMENDED $5,969 $10,536 $1,672
42,204
kWh
$4,297
-
MMBtu
TOTAL IMPLEMENTED $2,540 $6,580 $1,672
42,204
kWh
$868
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs