ITAC Assessment: NC0005
ITAC logo
ITAC Assessment: NC0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Elevator Cable
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 137,225
ft2
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,102 4,443,728
kWh
Natural Gas $17,316 2,922
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,591 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,001 $1,477 $6,001
81,184
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,369 $7,480 $3,369
45,428
kWh
03 2.4131: Size electric motors for peak operating efficiency $2,496 $1,800 $2,496
33,705
kWh
04 2.4133: Use most efficient type of electric motors $7,174 $13,550 $7,174
97,011
kWh
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $10,802 $16,798 $10,802
145,955
kWh
06 2.7244: Revise smoke cleanup from operations $3,285 $3,161 $3,285
94,959
kWh
07 2.7447: Install vinyl strip / high speed / air curtain doors $475 $1,800 $475
6,448
kWh
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,689 $400 $4,689
63,306
kWh
09 2.4239: Eliminate or reduce compressed air usage $9,300 $3,000 $9,300
125,733
kWh
TOTAL RECOMMENDED $47,591 $49,466 $47,591
693,729
kWh
TOTAL IMPLEMENTED $20,835 $19,027 $20,835
281,654
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs