| Assessment Year | 1993 |
|---|---|
| Principal Product | Elevator Cable |
| NAICS |
n/a
|
| SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
137,225
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 6,600
hrs
|
| Location (State) | North Carolina |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $327,102 | 4,443,728 |
kWh
|
$0.074 |
| Natural Gas | $17,316 | 2,922 |
MMBtu
|
$5.93 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $47,591 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $20,835 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,001 | $1,477 |
$6,001
81,184
kWh
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,369 | $7,480 |
$3,369
45,428
kWh
|
|
| 03 | 2.4131: Size electric motors for peak operating efficiency | $2,496 | $1,800 |
$2,496
33,705
kWh
|
|
| 04 | 2.4133: Use most efficient type of electric motors | $7,174 | $13,550 |
$7,174
97,011
kWh
|
|
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $10,802 | $16,798 |
$10,802
145,955
kWh
|
|
| 06 | 2.7244: Revise smoke cleanup from operations | $3,285 | $3,161 |
$3,285
94,959
kWh
|
|
| 07 | 2.7447: Install vinyl strip / high speed / air curtain doors | $475 | $1,800 |
$475
6,448
kWh
|
|
| 08 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,689 | $400 |
$4,689
63,306
kWh
|
|
| 09 | 2.4239: Eliminate or reduce compressed air usage | $9,300 | $3,000 |
$9,300
125,733
kWh
|
|
| TOTAL RECOMMENDED | $47,591 | $49,466 |
$47,591
693,729
kWh
|
||
| TOTAL IMPLEMENTED | $20,835 | $19,027 |
$20,835
281,654
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs