ITAC Assessment: AS0333
ITAC logo
ITAC Assessment: AS0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Non-invasive therapeutic products (medical)
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $100
M
to 500
M
# of Employees 250
Plant Area 100,000
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 2,530
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,410 1,619,895
kWh
Electricity Demand $11,288 4,261
kW-mo/yr
Electricity Fees $7,505 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $231,179 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,869

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $597 $20 $242
6,112
kWh
$355
-
kW-mo/yr
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $156 $60 $54
1,373
kWh
$102
-
kW-mo/yr
-
03 2.7232: Replace existing hvac unit with high efficiency model $15,336 $22,750 $8,466
213,785
kWh
$6,870
-
kW-mo/yr
-
04 2.7111: Reduce illumination to minimum necessary levels $6,566 $666 $3,281
81,778
kWh
$3,285
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,116 $3,300 $1,116
28,193
kWh
- -
06 3.6192: Use a less expensive method of waste removal $1,272 $60 - - $1,272
07 3.5217: Reuse / recycle/ sell paper products $684 - - - $684
08 3.5217: Reuse / recycle/ sell paper products $3,852 $60 - - $3,852
09 4.521: Clear and rent existing space $201,600 $12,820 - - $201,600
TOTAL RECOMMENDED $231,179 $39,736 $13,159
331,241
kWh
$10,612
-
kW-mo/yr
$207,408
TOTAL IMPLEMENTED $1,869 $80 $242
6,112
kWh
$355
-
kW-mo/yr
$1,272
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs