ITAC Assessment: WV0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Electro-optical Positioning Products
NAICS
n/a
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 70,000
ft2
Annual Production 8,000
pieces
Production Hrs. Annual 4,420
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $199,769 2,272,567
kWh
Natural Gas $9,831 1,185
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $9,991 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,322

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,912 $3,173 $2,912
73,271
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $163 $200 $163
4,103
kWh
-
03 2.4314: Use synthetic lubricant $150 - $150
3,810
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $278 $110 $278
7,034
kWh
-
05 2.7447: Install vinyl strip / high speed / air curtain doors $6,410 $2,900 - $6,410
-
MMBtu
06 2.2511: Insulate bare equipment $78 $91 - $78
-
MMBtu
TOTAL RECOMMENDED $9,991 $6,474 $3,503
88,218
kWh
$6,488
-
MMBtu
TOTAL IMPLEMENTED $9,322 $6,073 $2,912
73,271
kWh
$6,410
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs