ITAC Assessment: WV0047
ITAC logo
ITAC Assessment: WV0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Travel Trailers
NAICS
n/a
SIC 3792: Travel Trailers and Campers
Sales Range $50
M
to 100
M
# of Employees 369
Plant Area 48,000
ft2
Annual Production 4,500
pieces
Production Hrs. Annual 4,680
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,978 931,712
kWh
Natural Gas $24,121 3,300
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,322 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,069

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $379 $952 $379
14,361
kWh
-
02 2.4221: Install compressor air intakes in coolest locations $504 $700 $504
19,050
kWh
-
03 2.2437: Recover waste heat from equipment $1,908 $670 - $1,908
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,126 $1,000 $3,126
118,699
kWh
-
05 2.4314: Use synthetic lubricant $501 - $501
19,050
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $441 - $441
16,706
kWh
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $154 $20 $154
5,862
kWh
-
08 2.7241: Install outside air damper / economizer on hvac unit $4,246 $1,267 $4,246
161,196
kWh
-
09 2.2531: Re-size charging openings or add movable cover or door $1,063 $30 - $1,063
-
MMBtu
TOTAL RECOMMENDED $12,322 $4,639 $9,351
354,924
kWh
$2,971
-
MMBtu
TOTAL IMPLEMENTED $5,069 $1,982 $4,006
152,110
kWh
$1,063
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs