Assessment Year | 1995 |
---|---|
Principal Product | Travel Trailers |
NAICS |
n/a
|
SIC | 3792: Travel Trailers and Campers |
Sales Range | $50 M to 100M |
# of Employees | 369 |
Plant Area |
48,000
ft2
|
Annual Production | 4,500
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | Maryland |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,978 | 931,712 |
kWh
|
$0.078 |
Natural Gas | $24,121 | 3,300 |
MMBtu
|
$7.31 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,322 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,069 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $379 | $952 |
$379
14,361
kWh
|
- | |
02 | 2.4221: Install compressor air intakes in coolest locations | $504 | $700 |
$504
19,050
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,908 | $670 | - |
$1,908
-
MMBtu
|
|
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,126 | $1,000 |
$3,126
118,699
kWh
|
- | |
05 | 2.4314: Use synthetic lubricant | $501 | - |
$501
19,050
kWh
|
- | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $441 | - |
$441
16,706
kWh
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $154 | $20 |
$154
5,862
kWh
|
- | |
08 | 2.7241: Install outside air damper / economizer on hvac unit | $4,246 | $1,267 |
$4,246
161,196
kWh
|
- | |
09 | 2.2531: Re-size charging openings or add movable cover or door | $1,063 | $30 | - |
$1,063
-
MMBtu
|
|
TOTAL RECOMMENDED | $12,322 | $4,639 |
$9,351
354,924
kWh
|
$2,971
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,069 | $1,982 |
$4,006
152,110
kWh
|
$1,063
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs