ITAC Assessment: IC0291
ITAC logo
ITAC Assessment: IC0291
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product State Vehicle Garage and Offices
NAICS 551114: Corporate, Subsidiary, and Regional Managing Offices
SIC 6541: Title Abstract Offices
Sales Range less than $500
k
# of Employees 30
Plant Area 46,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $36,262 394,240
kWh
Electricity Demand $14,131 1,106
kW-mo/yr
Electricity Fees $8,222 -
Natural Gas $13,507 1,562
MMBtu
TOTAL YEARLY COSTS $72,122
RECOMMENDED SAVINGS* $14,301 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,744 $3,353 $1,673
18,183
kWh
$1,072
-
kW-mo/yr
-
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $2,427 $380 - - $2,427
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,929 $5,695 $2,412
26,218
kWh
$1,517
-
kW-mo/yr
-
04 2.7135: Install occupancy sensors $5,123 - $4,715
51,254
kWh
$407
-
kW-mo/yr
-
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $78 $157 $78
844
kWh
- -
TOTAL RECOMMENDED $14,301 $9,585 $8,878
96,498
kWh
$2,996
-
kW-mo/yr
$2,427
-
MMBtu
TOTAL IMPLEMENTED $14,301 $9,585 $8,878
96,498
kWh
$2,996
-
kW-mo/yr
$2,427
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs