ITAC Assessment: WV0044
ITAC logo
ITAC Assessment: WV0044
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Foam Products
NAICS
n/a
SIC 3086: Plastics Foam Products
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area 380,000
ft2
Annual Production 332,800
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,236,247 27,444,608
kWh
Natural Gas $63,804 9,079
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,050 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,301

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $687 $68
2,345
kWh
-
02 2.2614: Use cooling tower or economizer to replace chiller cooling $6,479 $4,000 $6,479
221,278
kWh
-
03 2.2437: Recover waste heat from equipment $13,270 $548 - $13,270
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $4,195 $1,032 $4,195
143,318
kWh
-
05 2.4314: Use synthetic lubricant $3,038 - $3,038
103,751
kWh
-
TOTAL RECOMMENDED $27,050 $6,267 $13,780
470,692
kWh
$13,270
-
MMBtu
TOTAL IMPLEMENTED $7,301 $1,719 $7,301
249,414
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs