Assessment Year | 1994 |
---|---|
Principal Product | Bearings |
NAICS |
n/a
|
SIC | 3562: Ball and Roller Bearings |
Sales Range | $50 M to 100M |
# of Employees | 280 |
Plant Area |
300,000
ft2
|
Annual Production | 12,000,000
pieces
|
Production Hrs. Annual | 6,720
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $760,731 | 15,663,248 |
kWh
|
$0.049 |
Natural Gas | $155,105 | 33,095 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,305 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,753 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,279 | $7,375 |
$4,279
177,022
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,921 | - |
$1,921
79,426
kWh
|
- | |
03 | 2.4221: Install compressor air intakes in coolest locations | $2,094 | $1,372 |
$2,094
86,753
kWh
|
- | |
04 | 2.2437: Recover waste heat from equipment | $3,973 | $440 | - |
$3,973
-
MMBtu
|
|
05 | 2.7243: Improve air circulation with destratification fans / other methods | $3,391 | $4,400 | - |
$3,391
-
MMBtu
|
|
06 | 2.2414: Use waste heat from hot flue gases to preheat | $11,021 | $6,660 | - |
$11,021
-
MMBtu
|
|
07 | 2.7124: Make a practice of turning off lights when not needed | $340 | $200 |
$340
14,068
kWh
|
- | |
08 | 2.4314: Use synthetic lubricant | $2,246 | - |
$2,246
92,907
kWh
|
- | |
09 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,040 | $35,000 |
$8,040
332,943
kWh
|
- | |
TOTAL RECOMMENDED | $37,305 | $55,447 |
$18,920
783,119
kWh
|
$18,385
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,753 | $43,947 |
$14,753
610,786
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs