| Assessment Year | 1994 |
|---|---|
| Principal Product | Truck hoods |
| NAICS |
n/a
|
| SIC | 3089: Plastics Products, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 303 |
| Plant Area |
284,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,064
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $794,357 | 16,883,060 |
kWh
|
$0.047 |
| Natural Gas | $349,177 | 92,484 |
MMBtu
|
$3.78 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $285,031 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $195,686 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,256 | $5,485 |
$2,256
85,287
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $298 | - |
$298
10,551
kWh
|
- | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $77,346 | $5,000 | - |
$77,346
-
MMBtu
|
|
| 04 | 2.7241: Install outside air damper / economizer on hvac unit | $15,913 | $8,987 |
$15,913
602,579
kWh
|
- | |
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $22,600 | $9,000 | - |
$22,600
-
MMBtu
|
|
| 06 | 2.2426: Use waste heat from flue gases to heat space conditioning air | $47,244 | $1,200 | - |
$47,244
-
MMBtu
|
|
| 07 | 2.2136: Install / repair insulation on steam lines | $2,475 | $480 | - |
$2,475
-
MMBtu
|
|
| 08 | 2.2511: Insulate bare equipment | $2,225 | $569 | - |
$2,225
-
MMBtu
|
|
| 09 | 2.7261: Install timers and/or thermostats | $95,384 | $6,300 |
$95,384
4,248,535
kWh
|
- | |
| 10 | 2.2211: Use optimum temperature | $15,702 | $800 | - |
$15,702
-
MMBtu
|
|
| 11 | 2.4314: Use synthetic lubricant | $3,588 | - |
$3,588
135,991
kWh
|
- | |
| TOTAL RECOMMENDED | $285,031 | $37,821 |
$117,439
5,082,943
kWh
|
$167,592
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $195,686 | $18,634 |
$97,938
4,344,373
kWh
|
$97,748
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs