ITAC Assessment: WV0021
ITAC logo
ITAC Assessment: WV0021
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Test instrumentation
NAICS
n/a
SIC 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products
Sales Range $10
M
to 50
M
# of Employees 320
Plant Area 149,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,400
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $337,397 3,763,189
kWh
Natural Gas $17,946 6,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,409

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $613 $2,593 $613
15,533
kWh
-
02 2.4133: Use most efficient type of electric motors $106 $3,890 $106
2,638
kWh
-
03 2.2136: Install / repair insulation on steam lines $1,191 $490 - $1,191
-
MMBtu
04 2.1213: Direct warmest air to combustion intake $340 $560 - $340
-
MMBtu
05 2.4221: Install compressor air intakes in coolest locations $215 $280 $215
5,275
kWh
-
06 2.6218: Turn off equipment when not in use $2,619 - - $2,619
-
MMBtu
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $690 - $690
8,206
kWh
-
TOTAL RECOMMENDED $5,774 $7,813 $1,624
31,652
kWh
$4,150
-
MMBtu
TOTAL IMPLEMENTED $1,409 $6,483 $1,409
26,377
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs