| Assessment Year | 1994 |
|---|---|
| Principal Product | Test instrumentation |
| NAICS |
n/a
|
| SIC | 3823: Industrial Instruments for Measurement, Display, and Control of Process Variables; and Related Products |
| Sales Range | $10 M to 50M |
| # of Employees | 320 |
| Plant Area |
149,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $337,397 | 3,763,189 |
kWh
|
$0.090 |
| Natural Gas | $17,946 | 6,297 |
MMBtu
|
$2.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,774 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $1,409 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $613 | $2,593 |
$613
15,533
kWh
|
- | |
| 02 | 2.4133: Use most efficient type of electric motors | $106 | $3,890 |
$106
2,638
kWh
|
- | |
| 03 | 2.2136: Install / repair insulation on steam lines | $1,191 | $490 | - |
$1,191
-
MMBtu
|
|
| 04 | 2.1213: Direct warmest air to combustion intake | $340 | $560 | - |
$340
-
MMBtu
|
|
| 05 | 2.4221: Install compressor air intakes in coolest locations | $215 | $280 |
$215
5,275
kWh
|
- | |
| 06 | 2.6218: Turn off equipment when not in use | $2,619 | - | - |
$2,619
-
MMBtu
|
|
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $690 | - |
$690
8,206
kWh
|
- | |
| TOTAL RECOMMENDED | $5,774 | $7,813 |
$1,624
31,652
kWh
|
$4,150
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $1,409 | $6,483 |
$1,409
26,377
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs