ITAC Assessment: WV0018
ITAC logo
ITAC Assessment: WV0018
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Lumber Products
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 78
Plant Area 136,660
ft2
Annual Production 0
units
Production Hrs. Annual 4,992
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,589 2,912,954
kWh
Wood $561,300 187,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,839 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Wood Savings
01 2.4133: Use most efficient type of electric motors $859 $29,260 $859
21,688
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $631 - $631
15,826
kWh
- -
03 2.1213: Direct warmest air to combustion intake $906 $365 - - $906
-
MMBtu
04 2.2437: Recover waste heat from equipment $803 $521 - $803
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $640 $368 $640
16,120
kWh
- -
TOTAL RECOMMENDED $3,839 $30,514 $2,130
53,634
kWh
$803
-
MMBtu
$906
-
MMBtu
TOTAL IMPLEMENTED $2,568 $30,146 $859
21,688
kWh
$803
-
MMBtu
$906
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs