Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Binding Equipment and Supplies
NAICS
n/a
SIC 3079:
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 87,500
ft2
Annual Production 165,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Nevada

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $196,674 3,127,784
kWh
Natural Gas $17,203 3,394
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,242 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,366

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $3,984 $3,956 $3,984
63,306
kWh
02 2.2511: Insulate bare equipment $1,493 $102 $1,493
23,740
kWh
03 2.7251: Reduce air conditioning load by evaporating water from roof $876 $12,500 $876
13,775
kWh
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $3,889 $900 $3,889
61,841
kWh
TOTAL RECOMMENDED $10,242 $17,458 $10,242
162,662
kWh
TOTAL IMPLEMENTED $9,366 $4,958 $9,366
148,887
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs