ITAC Assessment: WV0014
ITAC logo
ITAC Assessment: WV0014
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Food Products Lids
NAICS
n/a
SIC 3469: Metal Stampings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 72,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $251,950 5,992,087
kWh
Natural Gas $590,633 250,415
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $105,744 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $100,846

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $417 $762 $417
15,533
kWh
-
02 2.4133: Use most efficient type of electric motors $225 $4,980 $225
6,155
kWh
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $84 $35 - $84
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $2,445 $2,200 - $2,445
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $4,814 $1,840 - $4,814
-
MMBtu
06 2.1233: Analyze flue gas for proper air/fuel ratio $90,331 $5,000 - $90,331
-
MMBtu
07 2.2437: Recover waste heat from equipment $439 $680 - $439
-
MMBtu
08 2.2428: Use flue gases in radiant heater for space heating, ovens, etc $6,989 $3,635 - $6,989
-
MMBtu
TOTAL RECOMMENDED $105,744 $19,132 $642
21,688
kWh
$105,102
-
MMBtu
TOTAL IMPLEMENTED $100,846 $17,257 $642
21,688
kWh
$100,204
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings