ITAC Assessment: WV0012
ITAC logo
ITAC Assessment: WV0012
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product PVC Products
NAICS
n/a
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 500,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $644,627 19,634,525
kWh
Natural Gas $529,124 148,777
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $5,765 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,800

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,687 $1,500 - $1,687
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $1,050 $1,800 - $1,050
-
MMBtu
03 2.4221: Install compressor air intakes in coolest locations $302 $170 $302
17,292
kWh
-
04 2.7243: Improve air circulation with destratification fans / other methods $1,915 $3,200 - $1,915
-
MMBtu
05 2.7124: Make a practice of turning off lights when not needed $758 $570 $758
43,376
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $53 $916 $53
2,931
kWh
-
TOTAL RECOMMENDED $5,765 $8,156 $1,113
63,599
kWh
$4,652
-
MMBtu
TOTAL IMPLEMENTED $2,800 $3,156 $1,113
63,599
kWh
$1,687
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs