ITAC Assessment: WV0007
ITAC logo
ITAC Assessment: WV0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Personnel Safety Devices
NAICS
n/a
SIC 3842: Orthopedic, Prosthetic, and Surgical Appliances and Supplies
Sales Range $50
M
to 100
M
# of Employees 464
Plant Area 300,000
ft2
Annual Production 0
units
Production Hrs. Annual 7,488
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $445,935 11,107,269
kWh
Natural Gas $53,058 9,098
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,627 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,193

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $1,527 $1,500 - $1,527
-
MMBtu
02 2.4133: Use most efficient type of electric motors $766 $35,270 $766
35,170
kWh
-
03 2.7243: Improve air circulation with destratification fans / other methods $3,899 $6,000 - $3,899
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $968 $330 $968
44,256
kWh
-
05 2.2511: Insulate bare equipment $54 $201 $54
2,638
kWh
-
06 2.2443: Re-use or recycle hot or cold process exhaust air $8,932 - - $8,932
-
MMBtu
07 2.2414: Use waste heat from hot flue gases to preheat $1,481 $1,030 - $1,481
-
MMBtu
TOTAL RECOMMENDED $17,627 $44,331 $1,788
82,064
kWh
$15,839
-
MMBtu
TOTAL IMPLEMENTED $12,193 $37,100 $1,734
79,426
kWh
$10,459
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs