Assessment Year | 2001 |
---|---|
Principal Product | axles |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 45 |
Plant Area |
35,000
ft2
|
Annual Production | 16,500
pieces
|
Production Hrs. Annual | 4,680
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,074 | 1,294,080 |
kWh
|
$0.088 |
Electricity Demand | $37,062 | 4,688 |
kW-mo/yr
|
$7.91 |
Electricity Fees | $2,430 | - |
|
- |
Natural Gas | $112,417 | 17,848 |
MMBtu
|
$6.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $102,902 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $75,052 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $17,501 | $630 |
$16,141
123,210
kWh
|
$2,140
-
kW-mo/yr
|
- | $(-780.0) | - | |
02 | 2.1135: Repair furnaces and oven doors so that they seal efficiently | $2,859 | $500 | - | - |
$2,859
-
MMBtu
|
- | - | |
03 | 2.7145: Install skylights | $1,567 | $3,000 |
$529
7,621
kWh
|
$1,038
-
kW-mo/yr
|
- | - | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,741 | $12,000 | - |
$4,741
-
kW-mo/yr
|
- | - | - | |
05 | 2.8114: Change rate schedules or other changes in utility service | $26,071 | $150 | - | - | - | - | $26,071 | |
06 | 4.321: Optimize production lot sizes and inventories | $20,250 | $416 |
$18,016
163,950
kWh
|
$2,234
-
kW-mo/yr
|
- | - | - | |
07 | 4.514: Re-arrange equipment layout to reduce handling costs | $29,913 | $29,612 | - | - | - | $29,913 | - | |
TOTAL RECOMMENDED | $102,902 | $46,308 |
$34,686
294,781
kWh
|
$10,153
-
kW-mo/yr
|
$2,859
-
MMBtu
|
$29,133 | $26,071 | ||
TOTAL IMPLEMENTED | $75,052 | $33,392 |
$16,670
130,831
kWh
|
$3,178
-
kW-mo/yr
|
- | $29,133 | $26,071 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs