ITAC Assessment: LM0007
ITAC logo
ITAC Assessment: LM0007
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product axles
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 45
Plant Area 35,000
ft2
Annual Production 16,500
pieces
Production Hrs. Annual 4,680
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $114,074 1,294,080
kWh
Electricity Demand $37,062 4,688
kW-mo/yr
Electricity Fees $2,430 -
Natural Gas $112,417 17,848
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $102,902 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $75,052

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $17,501 $630 $16,141
123,210
kWh
$2,140
-
kW-mo/yr
- $(-780.0) -
02 2.1135: Repair furnaces and oven doors so that they seal efficiently $2,859 $500 - - $2,859
-
MMBtu
- -
03 2.7145: Install skylights $1,567 $3,000 $529
7,621
kWh
$1,038
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,741 $12,000 - $4,741
-
kW-mo/yr
- - -
05 2.8114: Change rate schedules or other changes in utility service $26,071 $150 - - - - $26,071
06 4.321: Optimize production lot sizes and inventories $20,250 $416 $18,016
163,950
kWh
$2,234
-
kW-mo/yr
- - -
07 4.514: Re-arrange equipment layout to reduce handling costs $29,913 $29,612 - - - $29,913 -
TOTAL RECOMMENDED $102,902 $46,308 $34,686
294,781
kWh
$10,153
-
kW-mo/yr
$2,859
-
MMBtu
$29,133 $26,071
TOTAL IMPLEMENTED $75,052 $33,392 $16,670
130,831
kWh
$3,178
-
kW-mo/yr
- $29,133 $26,071
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs