ITAC Assessment: WV0004
ITAC logo
ITAC Assessment: WV0004
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Ice Cream Cones
NAICS
n/a
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 120,000
ft2
Annual Production 0
units
Production Hrs. Annual 8,736
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $218,709 3,436,108
kWh
Natural Gas $277,357 73,702
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $2,528 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,475 $5,513 $1,475
55,979
kWh
-
02 2.4133: Use most efficient type of electric motors $219 $5,630 $219
8,206
kWh
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $643 $1,110 - $643
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $191 $347 - $191
-
MMBtu
TOTAL RECOMMENDED $2,528 $12,600 $1,694
64,185
kWh
$834
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs