Assessment Year | 2013 |
---|---|
Principal Product | Pharmacutical |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 92 |
Plant Area |
240,000
ft2
|
Annual Production | 100,000
pieces
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,044,600 | 25,270,687 |
kWh
|
$0.041 |
Electricity Demand | $592,971 | 43,609 |
kW-mo/yr
|
$13.60 |
Electricity Fees | $250,878 | - |
|
- |
Natural Gas | $369,797 | 68,093 |
MMBtu
|
$5.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $226,977 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $145,423 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7221: Lower temperature during the winter season and vice-versa | $61,014 | $80 |
$41,920
1,022,437
kWh
|
$19,094
-
kW-mo/yr
|
- | |
02 | 2.2414: Use waste heat from hot flue gases to preheat | $34,598 | $56,000 | - | - |
$34,598
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $27,781 | $21,720 |
$19,085
465,491
kWh
|
$8,696
-
kW-mo/yr
|
- | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $23,367 | $1,660 |
$5,619
137,064
kWh
|
$17,748
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $17,954 | $80 |
$7,550
184,152
kWh
|
$10,404
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $14,391 | $14,480 |
$9,886
241,119
kWh
|
$4,505
-
kW-mo/yr
|
- | |
07 | 2.4221: Install compressor air intakes in coolest locations | $12,902 | $799 |
$8,863
216,180
kWh
|
$4,039
-
kW-mo/yr
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $10,576 | $22,610 |
$5,530
134,884
kWh
|
$5,046
-
kW-mo/yr
|
- | |
09 | 2.2511: Insulate bare equipment | $6,625 | $4,623 | - | - |
$6,625
-
MMBtu
|
|
10 | 2.2511: Insulate bare equipment | $5,765 | $3,960 | - | - |
$5,765
-
MMBtu
|
|
11 | 2.7135: Install occupancy sensors | $5,219 | $1,575 |
$3,585
87,444
kWh
|
$1,634
-
kW-mo/yr
|
- | |
12 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,552 | $3,840 |
$2,440
59,506
kWh
|
$1,112
-
kW-mo/yr
|
- | |
13 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,233 | $17,980 |
$2,221
54,163
kWh
|
$1,012
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $226,977 | $149,407 |
$106,699
2,602,440
kWh
|
$73,290
-
kW-mo/yr
|
$46,988
-
MMBtu
|
||
TOTAL IMPLEMENTED | $145,423 | $41,284 |
$82,953
2,023,280
kWh
|
$62,470
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs