ITAC Assessment: MI0251
ITAC logo
ITAC Assessment: MI0251
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Pharmacutical
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 92
Plant Area 240,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,044,600 25,270,687
kWh
Electricity Demand $592,971 43,609
kW-mo/yr
Electricity Fees $250,878 -
Natural Gas $369,797 68,093
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $226,977 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,423

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $61,014 $80 $41,920
1,022,437
kWh
$19,094
-
kW-mo/yr
-
02 2.2414: Use waste heat from hot flue gases to preheat $34,598 $56,000 - - $34,598
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,781 $21,720 $19,085
465,491
kWh
$8,696
-
kW-mo/yr
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $23,367 $1,660 $5,619
137,064
kWh
$17,748
-
kW-mo/yr
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $17,954 $80 $7,550
184,152
kWh
$10,404
-
kW-mo/yr
-
06 2.4231: Reduce the pressure of compressed air to the minimum required $14,391 $14,480 $9,886
241,119
kWh
$4,505
-
kW-mo/yr
-
07 2.4221: Install compressor air intakes in coolest locations $12,902 $799 $8,863
216,180
kWh
$4,039
-
kW-mo/yr
-
08 2.4221: Install compressor air intakes in coolest locations $10,576 $22,610 $5,530
134,884
kWh
$5,046
-
kW-mo/yr
-
09 2.2511: Insulate bare equipment $6,625 $4,623 - - $6,625
-
MMBtu
10 2.2511: Insulate bare equipment $5,765 $3,960 - - $5,765
-
MMBtu
11 2.7135: Install occupancy sensors $5,219 $1,575 $3,585
87,444
kWh
$1,634
-
kW-mo/yr
-
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,552 $3,840 $2,440
59,506
kWh
$1,112
-
kW-mo/yr
-
13 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,233 $17,980 $2,221
54,163
kWh
$1,012
-
kW-mo/yr
-
TOTAL RECOMMENDED $226,977 $149,407 $106,699
2,602,440
kWh
$73,290
-
kW-mo/yr
$46,988
-
MMBtu
TOTAL IMPLEMENTED $145,423 $41,284 $82,953
2,023,280
kWh
$62,470
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs