| Assessment Year | 1994 |
|---|---|
| Principal Product | Product Marking , Coding |
| NAICS |
n/a
|
| SIC | 3569: General Industrial Machinery and Equipment, Not Elsewhere |
| Sales Range | $50 M to 100M |
| # of Employees | 790 |
| Plant Area |
301,400
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | New Hampshire |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $735,275 | 8,090,270 |
kWh
|
$0.091 |
| Natural Gas | $40,340 | 8,576 |
MMBtu
|
$4.70 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $38,407 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,935 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | LPG Savings |
|---|---|---|---|---|---|---|
| 01 | 2.6212: Turn off equipment during breaks, reduce operating time | $12,627 | - |
$12,627
138,921
kWh
|
- | |
| 02 | 2.2437: Recover waste heat from equipment | $9,713 | $22,395 | - |
$9,713
-
MMBtu
|
|
| 03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $8,732 | $20,860 |
$8,732
-
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,154 | - |
$4,154
46,014
kWh
|
- | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $1,012 | $1,062 |
$1,012
11,137
kWh
|
- | |
| 06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $939 | $100 |
$939
12,309
kWh
|
- | |
| 07 | 2.7111: Reduce illumination to minimum necessary levels | $503 | $300 |
$503
5,569
kWh
|
- | |
| 08 | 2.7135: Install occupancy sensors | $400 | $416 |
$400
4,396
kWh
|
- | |
| 09 | 2.4133: Use most efficient type of electric motors | $327 | $961 |
$327
3,517
kWh
|
- | |
| TOTAL RECOMMENDED | $38,407 | $46,094 |
$28,694
221,863
kWh
|
$9,713
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,935 | $2,423 |
$6,935
78,546
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | LPG Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs