ITAC Assessment: WV0001
ITAC logo
ITAC Assessment: WV0001
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product nothing
NAICS
n/a
SIC 3449: Miscellaneous Structural Metal Work
Sales Range $500
k
to 1
M
# of Employees 13
Plant Area 30,000
ft2
Annual Production 0
units
Production Hrs. Annual 6,336
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $6,741 91,149
kWh
Natural Gas $1,555 229
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,474

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $241 $144 $241
5,862
kWh
-
02 2.4133: Use most efficient type of electric motors $457 $930 $457
6,448
kWh
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $140 $170 - $140
-
MMBtu
04 2.7447: Install vinyl strip / high speed / air curtain doors $120 $60 - $120
-
MMBtu
05 2.7243: Improve air circulation with destratification fans / other methods $480 $450 - $480
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $36 $30 $36
586
kWh
-
TOTAL RECOMMENDED $1,474 $1,784 $734
12,896
kWh
$740
-
MMBtu
TOTAL IMPLEMENTED $1,474 $1,784 $734
12,896
kWh
$740
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs