Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Sythentic Paper - Wide Format Graqphics
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2671: Packaging Paper and Plastics Film, Coated and Laminated
Sales Range $100
M
to 500
M
# of Employees 39
Plant Area 120,500
ft2
Annual Production 2,033
ton
Production Hrs. Annual 3,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,081 406,900
kWh
Electricity Demand $18,870 2,516
kW-mo/yr
Electricity Fees $11,113 -
Natural Gas $23,409 3,047
MMBtu
Waste Disposal Costs
Water Usage $5,198 78
Tgal
TOTAL YEARLY COSTS $90,671
RECOMMENDED SAVINGS* $5,399 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $2,667 - - - - $2,667
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,124 $4,125 $994
12,588
kWh
$129
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $848 $1,376 $751
9,502
kWh
$98
-
kW-mo/yr
- -
04 2.3132: Recharge batteries on during off-peak demand periods $760 $1,860 - - $760 -
TOTAL RECOMMENDED $5,399 $7,361 $1,745
22,090
kWh
$227
-
kW-mo/yr
$760 $2,667
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs