Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Carbonless Paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 111
Plant Area 110,000
ft2
Annual Production 68,867,709
lb
Production Hrs. Annual 6,240
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $285,920 5,484,600
kWh
Electricity Demand $237,401 14,423
kW-mo/yr
Electricity Fees $20,832 -
Natural Gas $294,500 60,590
MMBtu
Waste Disposal Costs
Water Usage $29,763 8,260
Tgal
TOTAL YEARLY COSTS $868,416
RECOMMENDED SAVINGS* $36,326 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $11,263 $42,000 - - $11,263
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,181 $12,600 $7,101
136,555
kWh
$3,080
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $5,066 - $3,534
67,954
kWh
$1,532
-
kW-mo/yr
-
04 2.7444: Close holes and openings in building such as broken windows $4,905 $580 - - $4,905
-
MMBtu
05 2.7224: Reduce space conditioning during non-working hours $4,185 $520 - - $4,185
-
MMBtu
06 2.7135: Install occupancy sensors $480 $405 $327
6,290
kWh
$153
-
kW-mo/yr
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $246 $333 $146
2,838
kWh
$100
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,326 $56,438 $11,108
213,637
kWh
$4,865
-
kW-mo/yr
$20,353
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs