| Assessment Year | 2026 |
|---|---|
| Principal Product | Carbonless Paper |
| NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
| SIC | 2672: Coated and Laminated Paper, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 111 |
| Plant Area |
110,000
ft2
|
| Annual Production | 68,867,709
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $285,920 | 5,484,600 |
kWh
|
$0.052 | |
| Electricity Demand | $237,401 | 14,423 |
kW-mo/yr
|
$16.46 | |
| Electricity Fees | $20,832 | - |
|
- | |
| Natural Gas | $294,500 | 60,590 |
MMBtu
|
$4.86 | |
| Waste Disposal Costs | |||||
| Water Usage | $29,763 | 8,260 |
Tgal
|
$3.60 | |
| TOTAL YEARLY COSTS | $868,416 | ||||
| RECOMMENDED SAVINGS* | $36,326 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2414: Use waste heat from hot flue gases to preheat | $11,263 | $42,000 | - | - |
$11,263
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,181 | $12,600 |
$7,101
136,555
kWh
|
$3,080
-
kW-mo/yr
|
- | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,066 | - |
$3,534
67,954
kWh
|
$1,532
-
kW-mo/yr
|
- | |
| 04 | 2.7444: Close holes and openings in building such as broken windows | $4,905 | $580 | - | - |
$4,905
-
MMBtu
|
|
| 05 | 2.7224: Reduce space conditioning during non-working hours | $4,185 | $520 | - | - |
$4,185
-
MMBtu
|
|
| 06 | 2.7135: Install occupancy sensors | $480 | $405 |
$327
6,290
kWh
|
$153
-
kW-mo/yr
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $246 | $333 |
$146
2,838
kWh
|
$100
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $36,326 | $56,438 |
$11,108
213,637
kWh
|
$4,865
-
kW-mo/yr
|
$20,353
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs