ITAC Assessment: WM0232
ITAC logo
ITAC Assessment: WM0232
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Metal Table Bases and Accessories
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2514: Metal Household Furniture
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 100,000
ft2
Annual Production 500,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,231 1,258,012
kWh
Electricity Demand $56,664 5,130
kW-mo/yr
Electricity Fees $3,219 -
Natural Gas $125,790 15,777
MMBtu
Waste Disposal Costs
Water Usage $20,000 2,500
Tgal
TOTAL YEARLY COSTS $293,904
RECOMMENDED SAVINGS* $22,384 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4226: Use / purchase optimum sized compressor $11,149 $46,220 $7,567
108,095
kWh
$3,582
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,625 $22,658 $4,083
58,322
kWh
$1,542
-
kW-mo/yr
-
03 2.7224: Reduce space conditioning during non-working hours $3,500 $360 - - $3,500
-
MMBtu
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,332 $2,750 $1,096
15,653
kWh
$236
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $778 $800 $570
8,141
kWh
$208
-
kW-mo/yr
-
TOTAL RECOMMENDED $22,384 $72,788 $13,315
190,211
kWh
$5,568
-
kW-mo/yr
$3,500
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs