ITAC Assessment: AS0117
ITAC logo
ITAC Assessment: AS0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Commercial Printing Lithographic
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 53,580
ft2
Annual Production 34,000,000
pieces
Production Hrs. Annual 6,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $191,146 2,050,410
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $53,082 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,724 $10,910 $4,724
50,703
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,456 $1,092 $1,456
15,533
kWh
03 2.7111: Reduce illumination to minimum necessary levels $4,276 - $4,276
46,014
kWh
04 2.7135: Install occupancy sensors $616 $525 $616
6,741
kWh
05 2.4133: Use most efficient type of electric motors $757 $441 $757
8,206
kWh
06 2.4314: Use synthetic lubricant $719 $705 $719
7,913
kWh
07 2.7234: Use heat pump for space conditioning $11,679 $27,500 $11,679
125,440
kWh
08 2.7221: Lower temperature during the winter season and vice-versa $6,152 - $6,152
65,944
kWh
09 2.8114: Change rate schedules or other changes in utility service $22,703 $20,250 $22,703
-
kWh
TOTAL RECOMMENDED $53,082 $61,423 $53,082
326,494
kWh
TOTAL IMPLEMENTED $12,436 $27,941 $12,436
133,646
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings