ITAC Assessment: WM0222
ITAC logo
ITAC Assessment: WM0222
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product machined compenents
NAICS 334413: Semiconductor and Related Device Manufacturing
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 220
Plant Area 42,500
ft2
Annual Production 15,000,000
pieces
Production Hrs. Annual 6,032
hrs
Location (State) Minnesota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,263 2,812,084
kWh
Electricity Demand $91,683 7,574
kW-mo/yr
Electricity Fees $107,395 -
Natural Gas $26,118 2,236
MMBtu
Waste Disposal Costs
Water Usage $37,295 2
Tgal
TOTAL YEARLY COSTS $474,754
RECOMMENDED SAVINGS* $22,022 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $13,099 $21,586 $10,299
137,320
kWh
$2,800
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,848 $12,763 $4,689
62,514
kWh
$1,160
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,034 $4,262 $1,666
22,216
kWh
$368
-
kW-mo/yr
-
04 2.7224: Reduce space conditioning during non-working hours $1,041 - $275
3,663
kWh
$67
-
kW-mo/yr
$700
-
MMBtu
TOTAL RECOMMENDED $22,022 $38,611 $16,928
225,713
kWh
$4,394
-
kW-mo/yr
$700
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs