Assessment Year | 2024 |
---|---|
Principal Product | Metal Food Cans |
NAICS | 332431: Metal Can Manufacturing |
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
525,000
ft2
|
Annual Production | 90,281,174
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $360,724 | 5,430,801 |
kWh
|
$0.066 |
Electricity Demand | $237,419 | 13,380 |
kW-mo/yr
|
$17.74 |
Electricity Fees | $12,457 | - |
|
- |
Natural Gas | $212,727 | 26,832 |
MMBtu
|
$7.93 |
TOTAL YEARLY COSTS | $823,327 | |||
RECOMMENDED SAVINGS* | $14,366 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,978 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $6,388 | $6,030 |
$4,665
70,686
kWh
|
$1,723
-
kW-mo/yr
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $3,590 | $2,250 |
$875
13,260
kWh
|
$2,715
-
kW-mo/yr
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,880 | $1,500 |
$2,103
31,870
kWh
|
$777
-
kW-mo/yr
|
|
04 | 2.7224: Reduce space conditioning during non-working hours | $1,508 | - |
$1,508
22,842
kWh
|
- | |
TOTAL RECOMMENDED | $14,366 | $9,780 |
$9,151
138,658
kWh
|
$5,215
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $7,978 | $3,750 |
$4,486
67,972
kWh
|
$3,492
-
kW-mo/yr
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs