ITAC Assessment: WM0214
ITAC logo
ITAC Assessment: WM0214
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Metal Food Cans
NAICS 332431: Metal Can Manufacturing
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $50
M
to 100
M
# of Employees 75
Plant Area 525,000
ft2
Annual Production 90,281,174
units
Production Hrs. Annual 7,488
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $360,724 5,430,801
kWh
Electricity Demand $237,419 13,380
kW-mo/yr
Electricity Fees $12,457 -
Natural Gas $212,727 26,832
MMBtu
TOTAL YEARLY COSTS $823,327
RECOMMENDED SAVINGS* $14,366 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,978

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4221: Install compressor air intakes in coolest locations $6,388 $6,030 $4,665
70,686
kWh
$1,723
-
kW-mo/yr
02 2.4239: Eliminate or reduce compressed air usage $3,590 $2,250 $875
13,260
kWh
$2,715
-
kW-mo/yr
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,880 $1,500 $2,103
31,870
kWh
$777
-
kW-mo/yr
04 2.7224: Reduce space conditioning during non-working hours $1,508 - $1,508
22,842
kWh
-
TOTAL RECOMMENDED $14,366 $9,780 $9,151
138,658
kWh
$5,215
-
kW-mo/yr
TOTAL IMPLEMENTED $7,978 $3,750 $4,486
67,972
kWh
$3,492
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs